Your biggest project wins don’t come from rushing into action. They come from knowing exactly what needs doing and when to do it.

Planning gives you the roadmap. Scheduling makes you actually arrive.

Most professionals confuse these two critical skills, treating them as one messy process. It’s what leads to missed deadlines and wasted resources.

This guide separates planning from scheduling, showing you how to master each skill independently before combining them into a system that delivers results. You’ll discover proven frameworks like Work Breakdown Structures and Gantt charts, plus visual templates that transform complex projects into clear, executable steps.

Whether you’re coordinating a product launch or mapping out your department’s quarterly goals, you’ll walk away with tools to turn ambitious plans into completed projects.

5 Steps To Effective Planning And Scheduling

Learning how to practice the basics of project planning and scheduling sets you up for success. Our five steps employ the project management concept of the “iron triangle,” – time, resources, and scope. These three elements are the basic ingredients of your plan. Always remember narrowing or expanding the range of one item (especially scope) impacts the other parts of this triangle. 

Step 1: Define Goal And Scope

This first step sets the project boundaries. Your goal defines the objective. Goals using the famous SMART framework should be Specific, Measurable, Achievable, Relevant, and Time-Based.

For example, let’s say that I am crafting a social media plan for my aspirational business, True North Resumes. A SMART goal might be: “To increase social media engagement, I will post three times a week on LinkedIn with resume tips for two months and then evaluate the results.”

Let’s look at this goal in a more visual way. 

smart goals with color-coded text explaining specific, measurable, achievable, relevant, and time-based criteria, with an example about increasing social media engagement that shows how planning determines concrete objectives rather than vague intentions

The scope of my posting goal is defined by where I will post, how often, and what kind of content I’ll create. Scope acts as a planning gatekeeper, determining what must be done to achieve your goal and what actions will not be included. 

Step 2: Break Down The Work

After setting your goal and determining the project scope, it’s time to list the tasks required to complete the project. This step is closely related to the Work Breakdown Structure technique, which we’ll discuss below. 

In this step, use scope to help keep the list of tasks manageable. If requests keep coming in for additional tasks unrelated to the SMART goal, suggest they be accomplished in another project. 

We also suggest that you examine the relationships between the tasks. Does one have to be completed before another can begin? Make sure that information is clear in your plan. 

At this stage, focus on determining:

  • Major tasks involved in each project phase
  • For each task, list all sub-tasks needed to complete the task
  • What deliverables will result from the accomplishment of each task
  • The relationships between tasks (dependencies). 

Step 3: Estimate Resources And Time

Breaking down work to be done is a major planning milestone. Next, you’ll need to estimate the resources (money, staffing, tools) and time needed to complete each task. 

At the end of this step, you will know:

  • Who is responsible for each task?
  • How long will each task take? 
  • How much will each task cost?
  • What tools are needed to complete each task?

When estimating complex or unfamiliar tasks, build time into your schedule allowing for challenges. 

Step 4: Sequence Tasks And Set Milestones

This is where you begin scheduling your project’s tasks. Your sequencing should fit the unique needs and dependencies between tasks. You will also define milestones to mark task completion. 

Step 5: Assign Dates And Finalize Schedule

This step moves project planning and scheduling from thought into action. Your schedule will provide a real-world “finish line” for accomplishing the tasks you’ve set out in your plan. 

As you assign dates and discuss the work with the people who will do it, you may need to adjust milestones or shift deadlines for sub-tasks. The more dialog you have up front, the less likely you’ll need to craft a tricky revision of the schedule when you’re deep into the project. 

Once you’ve solidified your schedule, share your plan and timeline with stakeholders. As your team executes the project plan, you’ll need to monitor progress and adjust where needed. 

Common Techniques For Planning And Scheduling Projects

Having laid the foundation for successful project planning and scheduling, let’s review some well-tested methods for setting up your plan.

Work Breakdown Structure (WBS)

A Work Breakdown Structure (WBS) document breaks goals into smaller pieces, including key deliverables, sub-deliverables, and individual work packages. WBS documents can be deliverable-based – organizing the work to be done by outcomes – or phase-based, categorizing tasks by execution sequence. 

Gantt Charts 

Once the WBS is done, the identified tasks can be loaded into a Gantt chart to map out completion of the work. The horizontal axis of a Gantt chart shows the projected timeline, and the vertical axis shows tasks to be accomplished. Gantt charts allow planners to plot dependencies between tasks, giving a clear idea of task progression. 

Kanban Boards

“Kanban” is a Japanese word that means “visual signal.” Users create cards (physical or digital) and place them in columns sorted from left to right, with categories such as “To Do,” “In Progress,” and “Done.” A key part of the kanban method is the work-in-progress limit, restricting the number of cards allowed in a particular column. 

Critical Path Method (CPM) 

CPM helps determine the fastest path to completing a project by reviewing all tasks. If you were cooking an omelet, heating the eggs in a pan would be critical; searching in the fridge for a garnish would not. The analysis phase of CPM is followed by scheduling tasks on the critical path to prevent delay. 

Timeboxing/Time Blocking 

Timeboxing emphasizes creating extended blocks of time on your schedule for working on specific tasks. For example, don’t just put in “writing” for the slot from 9 a.m. to noon on Wednesday. Schedule the slot as “writing a pitch letter to secure the next round of financing.” This method requires you to prioritize tasks for your time blocks and to have an accurate sense of how long tasks require.

Why Visualizing Your Plan And Schedule Works

Many of the methods we just discussed have a visual component to them. Using visually rich modes of communication when you plan and schedule offers many benefits: 

Visuals are more engaging. 

Studies show people retain 65 percent of what they learn when encountered through a combination of text and image.   

Visuals communicate your plans more clearly. 

Visualized plans allow you to view the big picture and fine details simultaneously.

Visuals more easily explain objectives. 

It’s easy to get all stakeholders on the same page quickly.

Visuals are excellent for spotting conflicts and tracking progress. 

Visualized plans surface resource clashes or unrealistic timelines.

Planning And Scheduling Visual Examples

You can use Piktochart and other free or low-cost platforms to help you visualize your planning and scheduling. Let’s look at some of the best templates available and unpack why they work. 

Timelines And Roadmaps

A roadmap provides a high-level overview of how a plan is to be carried out. It outlines phases of a project but rarely includes scheduling details. This Piktochart template shows a roadmap for document use and governance. 

infographic detailing the document life cycle in six steps from creation through archiving, with illustrated characters demonstrating each phase, helping project stakeholders understand the full process flow of document management

Use cases for roadmaps: 

  • Documentation of complex processes
  • New product rollouts
  • Service delivery blueprints

A timeline, on the other hand, provides dates for deliverables. Here is a timeline template adapted to show the schedule for a website content refresh.

weekly production schedule with team members assigned to specific deliverables each day, showing how planning and scheduling are key to coordinating team efforts and ensuring timely delivery of project deliverables throughout the week

Use cases for timelines:

  • Project kickoff meetings
  • Stakeholder buy-in events
  • Change-management overviews

Gantt-Style Charts

Charts patterned after the Gantt chart used in project management provide a visual “map” for efforts requiring a complex mix of resources and staffing and an extended timeline. This chart, created in Google Sheets, can be set up quickly using the platform’s “timeline” feature.

gantt-like chart in google sheets showing a project timeline for 2024 with color-coded task bars representing different project phases like stakeholder interviews, requirements gathering, and development, illustrating how scheduling software can visualize dependencies between project activities

Use cases for Gantt-style charts:

  • Construction projects
  • IT/computer projects
  • Event planning and promotion

Calendars

One of the most popular formats for scheduling is the humble calendar. It’s familiar to most and requires no prior project management knowledge.

If you need to create professional schedules quickly, Piktochart’s AI schedule maker can generate customized calendars from a simple text prompt. Describe your scheduling needs like ‘weekly project milestones for Q1 product launch’ or ‘daily routine for remote team coordination.’ You’ll then get a polished, visual schedule in under 10 seconds.

Here’s a monthly calendar for a web development project. Colorful icons make it easy to see important dates. 

project milestones calendar titled "rcv web development project" for january 2024, highlighting key dates including qa testing on january 10 and a client call on january 31, demonstrating how a project manager can visualize critical task deadlines

One way to represent project schedules with a shorter time frame is a weekly calendar. I adapted this template in about 10 minutes to provide a day-by-day update for a web content project. 

website content refresh timeline for happy valley farms spanning april through june 2025, with distinct phases including strategy development, seo optimization, and content creation, illustrating how execution plans break down complex projects
  • Employee work schedules
  • Project overviews
  • Call scheduling

Piktochart can also help you develop creative and engaging calendars with our upcoming AI Calendar Generator. 

Flowcharts

Flowcharts provide a visual guide to complicated, multi-step operations. They are useful when your project has a number of decision points where your team will need clear directions to proceed. 

This flowchart template for setting up social media channels guides the reader through each step in the process. 

flowchart titled "setting up social media channels for your business" with decision points creating yes/no paths, demonstrating how the scheduling process involves systematic decision-making to allocate resources effectively for maximum production efficiency

Use cases for flowcharts: 

  • Software build projects
  • Product development process mapping
  • Agile project management

Visual Checklists/Taskboards

Checklists and taskboards work in business for the same reason they worked at my parents’ house growing up: they provide users with a tangible, visible representation of the work to be done

This employee onboarding template combines an overview of steps in that process with a timeline for execution. 

12-step new employee onboarding checklist divided into pre-onboarding, first day, and first week sections, demonstrating how a detailed timetable helps ensure consistent quality control measures during the integration of new team members

Taskboards, such as those used in kanban systems, visualize a project’s work in progress and show where bottlenecks need to be removed. You can create a taskboard online with Trello, KanbanFlow, or even Google Sheets, as shown in the image below. 

kanban board template for google sheets with columns for backlog, to do, doing, and in review, showing the difference between planning and scheduling in project management by organizing tasks with assignees, descriptions, and due dates

Use cases for checklists and taskboards:

  • Processes with “must-do” steps to be completed in a particular sequence (like pre-flight checks for pilots)
  • Troubleshooting production workflows
  • Developing Standard Operating Procedures

Planning And Scheduling FAQs

What’s the difference between planning and scheduling?

Planning addresses “why” and “what” for a project – scheduling addresses “when” and “how.” Here’s a simple way to remember the key differences: 

  • Focus: Planning concentrates on goals, scope, and strategy; scheduling focuses on sequencing, resource allocation, and assigning dates/times to tasks.
  • Output: Planning outputs are documents that overview the project; scheduling outputs include task timelines and calendar entries. 
  • Level: Planning concentrates on high-level objectives and overarching goal(s); scheduling is detailed. 
  • Flexibility: Your planning process can be flexible – before you’ve finalized your goals. Once you’ve started scheduling, you have to go back many steps to revise. 

Does the order of planning and scheduling matter?

Yes. Timing and resources needed for your scheduled tasks could change dramatically depending on goals and strategy. If you try to schedule activities before planning, you can end up with an unrealistic schedule. 

Is it okay if my plan looks different from others?

Definitely! We’ve shown various visual formats in this article to reinforce one idea: the way your plan or schedule looks should meet the needs of YOUR project. The tools and techniques we’ve reviewed can help you make large projects more manageable. Use them any way you like to move forward with confidence and achieve your goals!